It's only two inspections

First inspection is the Toho Sewer Connection. This inspection verifies that the connection to the Toho clean-out is installed correctly and the required locate ball is in place.

Second inspection is the Toho Utility CO Inspection. This inspection verifies that the meter boxes and meters, clean-out pads, valves, curb markings, hydrants etc. are installed to Toho specifications.

If applicable, the Toho Efficiency Program (TEP) is automatically performed with the Toho Utility CO Inspection and consists of verifying the landscaping, irrigation and interior plumbing and appliances are installed to Toho’s approved TEP criteria.

Avoid unnecessary fees

Inspections should only be requested when the site is ready. Failed inspections will incur a $200 fee per failure. 

Cancellations

Cancellations must include address, permit number, type of inspection and be emailed to TWACI@tohowater.com before 12.00 a.m. Inspections requested through the Development Portal must be canceled in the portal before 12:00 a.m.

Questions?

If you have any questions about the Sewer Connection or Utility CO Inspection, please contact Toho’s Senior Construction Inspector Joseph Jayne at 407-944-5020 or send an email to TWACI@tohowater.com.

    Inspections Checklist

    Expand All

    Request your inspection

    Please submit an inspection request form no more than one business day before the inspection day. For same day inspections the request must be completed and received before 12 a.m. Any same day inspection requests received after 12 a.m. will automatically be moved to the next business day. Make sure you're ready for an inspection.