Extension and Expansion

System development charges provide a source of revenue to fund the extension and expansion of the utility system necessitated by new growth and development. The Board of Supervisors specifically finds that the utility system benefits all residents and businesses within the Toho service area and therefore system development charges shall be imposed on all new development.

It is fair and reasonable to require future growth, as represented by development, to contribute its fair share to the cost of improvements and additions to the utility system that are required to accommodate the impact generated by such growth.

Payments and receipts

Payments received before 3 p.m. will be processed the same day. After 3 p.m., payments will be processed the following business day. For receipts, please provide your email address with the payment.​

 

Current System Development Charges (SDCs) 

  CHARGE
Per Gallon Assessed
Water SDC ​$  8.05
Wastewater SDC ​$ 12.50
​Per Equivalent Residential Unit (ERU)
Water SDC @ 300 ERU $  2,415.00
​Wastewater SDC @ 276 ERU ​$  3,450.00

 

Policy and Rates
System Development Charge Policy
Flow Rates and Fees

 

New System Development Charges effective January 18, 2023

Toho Water Authority (Toho) will revise its System Development Charges (SDCs) effective January 18, 2023.

Current SDC fees have been in effect since June 27, 2012.  In consideration of this and the recent merger with St. Cloud Utilities, a comprehensive water and wastewater SDC study was conducted to determine the SDC schedule required to support infrastructure improvements associated with system wide capacity needs.  Along with the updated rates, relevant Toho policies and procedures governing the administration of SDCs and collection of fees were also reviewed.  A significant change in the SDC policy is a shift to a meter size basis for meters 2-inches and smaller.  Additionally, this change effectively consolidates fees, policies, and procedures for Toho, St. Cloud, and Sunbridge and eliminates the prior use-based fee schedule in this meter size range. 

Read the SDC resolution here.

For more information, please contact us at feeinquiry@tohowater.com or 407-944-5000.

Fee schedule timing

Before 1/18/2023, current SDC rates are in effect and no changes to the SDC process.

After 1/18/2023, the new SDC rates based on meter size will be in effect and any assessment for meter size above 2” will be subject to additional analysis by Toho Engineering.

In-flight development plans:

  • For existing projects that have been currently assessed, any additions to the project and/or associated meter fees before or after 1/18/2023 will follow the appropriate fee schedule.
  • For new projects, new SDC rate schedule will be based upon the date of payment. If assessed SDCs have not been paid prior to 1/18/2023, then a new assessment will be required using the new SDC fee schedule.

SDC RATE SCHEDULE (Effective January 18, 2023)

Per Gallon Assessed1

Water

Wastewater

$8.23 $15.04

1Per gallon assessments based upon maximum day usage Levels of Service for water of 400 gallons and wastewater of 276 gallons.

 

Meter Fees2

Meter Size

Water Fee

Wastewater Fee

¾” Meter $3,293 $4,151
1” Meter $5,488 $6,918
1.5” Meter $10,977 $13,837
2” Meter $17,563 $22,139

2All meter connections above 2” are subject to review and approval of water usage engineering analysis.

Questions and appointments