SDC SCHEDULE BASED ON METER SIZE
Meter SizeWater FeeWastewater FeeTotal
3/4"$6,650$3,293$9,943
1"$11,106$5,499$16,605
1.5"$22,145$10,966$33,111
2"$35,445$17,552$52,997
All meter connections above 2” are subject to review and approval of water usage engineering analysis.
PER GALLON ASSESSED*
Water$19.55
Wastewater$14.90
*Level of Service: Water = 340 gpd; Wastewater = 221 gpd
LEVEL OF SERVICE CALCULATION
 GPD/ERUPeak Day FactorTotal GPD
Typical Indoor Use (potable water)2001.2240
Supplemental Use (irrigation)502.0100
Total Max Daily Flow - Water340
Total Max Daily Flow - Wastewater    221

Wastewater Level of Service consistent with indoor water peaking factor

GPD = Gallons Per Day
ERU = Equivalent Residential Unit

MULTI-FAMILY LEVEL OF SERVICE (GPD)
Number of bedroomsWaterWastewater
1 (up to 750 sf)8074
2 (up to 1,500 sf)160148
3 (up to 2,250 sf)240222
4 (up to 3,000 sf)320296

 

Project assessments

  • For projects that were assessed prior to May 5, 2025, but assessment fees were not paid prior to this date, a new assessment will be required using the new SDC schedule.
  • If the assessed SDCs were paid in full prior to May 5, 2025, and no changes were made to the project (additional meters, building, etc.) a new assessment is not necessary. But if project changes were made, then a new assessment will be required using the new SDC schedule.
  • For projects assessed after May 5, 2025, the new SDC schedule will be used to calculate the assessment.

Timing of SDC payment

Payments can be made upon issuance of municipal building permit or Toho Utility Permit (TUP) with approved construction plans. In the event the issued building permit expires, notice of updated permit is required. 

The following is applicable if you are not ready to connect, but wish to pay your SDCs in advance.

  • Projects with Active Building Permit(s) and approved Toho plan(s) prior to May 5, 2025, the SDC fees prior to May 5, 2025, shall be paid. Note: payment must be initiated and completed with Toho Water Authority prior to May 5, 2025.
  • Projects with Active Building Permit(s) and approved Toho plan(s) after May 5, 2025, the new SDCs fees shall be paid.
  • For projects with Expired Building Permit(s) and approved Toho plan(s), notice of updated permit is required and:
    • If validated, SDC fees prior to May 5 ,2025, shall be paid
    • If SDCs have been paid, the difference between the initially assessed SDCs and the SDCs in effect shall be paid.
    • If an invoice has been issued, but SDCs have not been paid, then the new SDC fees must be paid in full. 
    • If SDC credits will be applied, the same process must be followed and the application of credits in full must occur prior to May 5, 2025 or a new assessment shall be required.

For more information and applicability, please call us at 407-944-5000 or email feeinquiry@tohowater.com